    Combining Solar and Heat Pumps

    Solar generates electricity; a heat pump uses electricity to move heat. Their seasonal performance and operating schedules need to be assessed together. Agua-Therm is the primary heating specialist; LIT handles the solar work.

    Agua-Therm

    What to specify

    Solar generation

    • Check seasonal rather than annual generation alone
    • Allow for shading and daytime export
    • Coordinate the solar scope with LIT

    Heat-pump design

    • Calculate heat loss and hot-water demand
    • Check emitters and required flow temperatures
    • Assess noise, siting and electrical capacity

    Controls and operation

    • Plan hot-water and heating schedules
    • Check compatibility with existing controls
    • Review pool heating as a separate load

    Build the plan before comparing prices

    1. Have Agua-Therm assess heating demand and the existing distribution system.
    2. Ask LIT to compare seasonal solar generation against the proposed electrical load.
    3. Agree each division's scope, interfaces, controls and aftercare responsibilities before work starts.

    This is a planning guide, not a documented customer installation. No customer quotes, measured savings, fixed package prices or verified returns are claimed.

    Compare itemised proposals

    Cost or obligationWhat to confirm
    Equipment and installationExact models, labour, tax, access equipment and any electrical or plumbing upgrades.
    Permits and registrationResponsible party, applicable municipal permissions, utility process and documents included.
    Running cost and aftercareTariff assumptions, maintenance, warranty exclusions, monitoring and potential replacements.
    Grants and financeCurrent eligibility, written lending terms and approval. Do not subtract unapproved support from the base budget.

    Frequently Asked Questions

    Energy Centre Group planning guidance. Updated 21 September 2026. Savings and project timelines require a property-specific assessment.